Escravos Seaport Industrial Complex in 3D
Delta State, Nigeria · 20,000 ha (earlier documents) or 30,000 ha (draft agreement 2026) · master plan by James Cubitt Architects (2022), georeferenced · programme cost US$3.75bn (project documents)
Development phase illustrative
Programme status ·
3.75US$bn programme cost
259US$M port capex (excl. dredging)
0ha in built zones (plan outlines)
PPP agreement draft, April 2026
Milestones: draft Schedule 2, months from the Effective Date. The 3D phases 0 to 3 are an illustrative picture of the sequence, not the agreement's own phase numbers.
Sources differ check before use
Cost and sensitivity
Base figures from the project documents. The ±30% steps are an illustrative sensitivity, not a forecast.
3D base
Tools
Measure: click points on the ground. Path length and, from three points, the enclosed area appear here.
Survey pins
Example: Test pin, 5.6271, 5.3929
Port comparison (Port Handbook 2018)
Import elevation data (DEM / bathymetry)
Paste or load a CSV with one point per line: latitude, longitude, elevation in m (land positive, water depth negative). Points are spread over about 600 m and replace the conceptual terrain where they cover the site. Nothing leaves your browser.
No elevation data loaded. The terrain is conceptual.
Fine-tune
Georeference and area check